Concrete Core Vibration Pipe Mold

Concrete Core Vibration Pipe Mold

1. Product description Concrete core vibration pipe mold machine relates to the technical field of cement pipe manufacturing equipment, in particular to a flexible joint, a steel socket jacking pipe, a grooved construction or a round concrete pipe forming equipment. The vibrating rod core of the...
Chat Now

Product Details

1. Product description

Concrete core vibration pipe mold machine relates to the technical field of cement pipe manufacturing equipment, in particular to a flexible joint, a steel socket jacking pipe, a grooved construction or a round concrete pipe forming equipment. The vibrating rod core of the core mold vibrator is connected to the vibrating rod body through a bearing. A belt transmission device is provided between the motor output shaft and the driven wheel. The main bearing seat is fixedly connected coaxially at the upper end of the driven wheel. The vibrating rod core is fixedly connected to the spline at the lower end of the vibrating rod core, and the spline sleeve is coaxially fixed to the upper end of the main bearing seat, and the spline is fitted in the spline sleeve. The spline drive of the utility model is a multi-tooth drive, with high bearing capacity, small stress concentration, and small weakening of the strength of the shaft and the hub, so that the vibrator has a longer service life, a large transmission torque and high efficiency, and improves production efficiency and energy utilization rate.

image

芯模

2.Main feature

1). Use natural or low temperature (30 40 ℃) steam curing method to save energy;

2). It can be formed with base and non-circular reinforced concrete pipe;

3). Improved production environment, low labor intensity and civilized production;

4). The inner wall can be produced with a corroded plastic film tube, and the process is simple;

5). Fewer procedures, broken production lines and fewer auxiliary lifting equipment;

6). No waste cement slurry is produced and less industrial waste residue.


3.Conservation control

1).Covered maintenance

The finished stern tube is covered with a special curing cover, without steam, and relying on its own cement hydration heat to maintain it; the curing time should be based on the outdoor temperature, and the material changes should be considered by the laboratory based on the measured strength of the In general, you can refer to the following table:

Outdoor temperature and hood curing time:

         0 ℃ -10 ℃ ≥24h

        10 ℃ -20 ℃ ≥18h

        Above 20 ℃ ≥14h

2). Outdoor maintenance

For the storage time of the drain pipe after steam curing and hood curing in the open air, the drain pipe should be cured by watering according to the climate, and the curing period should be no less than 7 days.


4.Our service

Pre-sale service: 

1. Free technical consultation service for customers

2.Provide customers with product samples, company profiles, credit credentials, etc.

3. Visit the factory and field trip


After-sales service: 

1. Product warranty period is 1 year

2. Large-scale equipment will send professional engineers to guide installation and commissioning services

3. Small equipment and mold phone guide installation and video instruction

4. Regular visits to customers to understand product usage and help solve various problems during use

5.24 hours technical support by Phone, E-mail, SKYPE, or Remote Control.


5.Our workshop

车间_副本 640x640


6.FAQ

Q: What is the Warranty for the machine?

A: For the machine,we have 1 years warranty.


Q:Are you a manufacturer or middle man?

A: We are manufacturer. Our factory has over 10 years experience and welcome to visit our factory.



Inquiry